Commit graph

76 commits

Author SHA1 Message Date
Marc Durepos
81624ea26c bemade_fsm: all tests passing for 16.0
- Got rid of planned_date_begin and planned_date_end fields. Commented
   out all related code for now. These were fields pending actual
   feature development anyway.
 - Added a product cateogory with income account and expense account to
   the _generate_product common test method. This fixes an error where
   Odoo complained about needing a due date for lines with account type
   = 'asset_receivable'.
 - Rewrote and refactored Task.action_fsm_validate to have it match with
   code from industry_fsm in 16.0.

NOTE: This change depends on code pushed in:
 - sale_workflow [16.0 ba7402471]
 - odoo_addons [16.0 766cd78]
 - PurchasedAddons [16.0 e5e9b7b]
2023-11-29 20:45:09 -05:00
Marc Durepos
23d7d34e71 Forward-port '15.0' into 16.0 2023-11-29 11:29:35 -05:00
Marc Durepos
272fc34fba bemade_fsm: replace domain with filter for parent task on searche views.
On all task views in the Field Service app, add a filter to the search
view to show only Parent Tasks (on by default).
2023-11-29 09:48:21 -05:00
Marc Durepos
47a0ac4176 bemade_fsm: hide completed tasks from To Schedule list 2023-11-23 17:22:08 -05:00
Marc Durepos
7a813d1c76 bemade_fsm: improvements to the task list view 2023-11-23 16:48:07 -05:00
Marc Durepos
87f9d59dc0 bemade_fsm 15.0.1.0.2 - add visits to FSM orders when missing
All sale orders containing a line that will produce an FSM task,
i.e. lines that are linked to a product of type service and with
service_tracking set to task_global_project, will be processed
to make sure that all such lines fall under a service visit. If
a visit already exists on the SO but lines are not covered by it,
the visit will be promoted to be the top item on the order before
confirmation. Otherwise, a default visit will be added to the top
of the order prior to proceeding with confirmation.
2023-11-23 16:18:42 -05:00
Marc Durepos
32def36af0 bemade_fsm: copying sale order now copies visits properly. 2023-11-21 12:24:52 -05:00
Marc Durepos
49d00269fa bemade_fsm: translate 'Visit' in visit task title. 2023-11-21 12:24:52 -05:00
Marc Durepos
8b8250ffbb bemade_fsm: completing an FSM tasks completes all its descendants as well. 2023-11-21 12:24:52 -05:00
Marc Durepos
0ddb7c8160 bemade_fsm: fix visit naming on tasks 2023-11-21 12:24:52 -05:00
Marc Durepos
7e3d5663aa Added a test to bemade_fsm. 2023-11-21 12:23:39 -05:00
Benoît Vézina
3ecbac2346 friday fix 2023-11-20 09:33:52 -05:00
Benoît Vézina
bcd039d89c odoo 16 2023-11-16 19:33:53 -05:00
Benoît Vézina
fb301db2b3 for migration 2023-11-16 09:01:22 -05:00
Benoît Vézina
839a2e2d32 split model 2023-11-15 18:49:18 -05:00
Marc Durepos
cf89585fae bemade_fsm: added a test for task template descriptions. Added description to subtask tree on task form view for easier editing by technicians. 2023-10-02 16:27:56 -04:00
Marc Durepos
617abd2067 bemade_addons: for template tasks, don't copy the sale line description if this is a sub-task. 2023-10-02 15:43:45 -04:00
Marc Durepos
399694d692 bemade_fsm: properly set the sequence on task template subtasks. 2023-10-02 15:13:30 -04:00
Marc Durepos
02f380dc91 bemade_fsm: Release 15.0.1 (beta)
* Added translations for French
 * Removed broken test tours (low value tests, high maintenance cost)
 * Updated version in manifest
2023-09-18 14:14:16 -04:00
Marc Durepos
632c03ebda bemade_fsm: Printing from a subtask prints the root ancestor.
Fixes Dur-Pro/bemade-addons#83

Also added some styling to prevent table headers overlapping with table
content when tables run multiple pages. This is due to a rendering bug
in wkhtmltopdf.
2023-09-18 14:14:16 -04:00
Marc Durepos
853862cde1 bemade_fsm: Improved task naming. Fixes Dur-Pro/bemade-addons#89. 2023-09-18 14:14:16 -04:00
Marc Durepos
83d84a7bfa bemade_fsm: PDF improvements
* Equipment summary added after the sale line summary.
   Fixes Dur-Pro/bemade-addons#60.
 * Different blocks of the document made conditional to content
 * Improved how tasks and subtasks are rendered
2023-09-18 14:14:16 -04:00
Marc Durepos
2a5b8dba42 bemade_fsm: remove square brackets from equipment complete name if no tag. 2023-09-18 14:14:16 -04:00
Marc Durepos
4a4214fabb bemade_fsm: added work order number, significant mods to work order PDF. 2023-09-18 14:14:16 -04:00
Marc Durepos
838db389b0 bemade_fsm: further progress on work order PDF. 2023-09-18 14:14:16 -04:00
Marc Durepos
8459ce3673 bemade_fsm: refactor work order report templates to break them into sub-templates for easier modification. 2023-09-18 14:14:16 -04:00
Marc Durepos
4aed4684d5 bemade_fsm: cleaning up template files. 2023-09-18 14:14:16 -04:00
Marc Durepos
a84b9d926a bemade_fsm: Got the "Sign Report" functionality working.
Found which template to extend to inject our new work order template
into the front-end signature page. Now need to add the timesheets info
with task tree into our template and we should be good to go.

Fixes Dur-Pro/bemade-addons#94
2023-09-18 14:14:16 -04:00
Marc Durepos
c4fdcd94b3 bemade_fsm: Work order report printing relevant SO lines summary. Re Dur-Pro/bemade-addons#94 2023-09-18 14:14:16 -04:00
Marc Durepos
f157ba3d9b bemade_fsm: Task naming modified to shorten child task names.
Fixes Dur-Pro/bemade-addons#92
2023-09-18 14:14:16 -04:00
Marc Durepos
bf45e250a2 bemade_fsm: Marking visit task done doesn't create SO line.
Added a test to confirm that marking the task associated to a visit
does not create an additional sale order line like it did before.

Fixes Dur-Pro/bemade-addons#93
2023-09-18 14:14:16 -04:00
Marc Durepos
0980f6fbb3 bemade_fsm: Marking visit task done completes its descendants.
Re: Dur-Pro/bemade-addons#93
2023-09-18 14:14:16 -04:00
Marc Durepos
c966af3343 bemade_fsm: Explicitly set user_ids=False on visit task creation. Fixes Dur-Pro/bemade-addons#90 2023-09-18 14:14:16 -04:00
Marc Durepos
9850b9115c bemade_fsm: Due date and initially planned hours on SO confirmation.
Fixes Dur-Pro/bemade-addons#86 and Dur-Pro/bemade-addons87
2023-09-18 14:14:16 -04:00
Marc Durepos
83b002e41c bemade_fsm: updates to qweb for pdf of work orders. 2023-09-18 14:14:16 -04:00
Marc Durepos
b367169579 bemade_fsm: updates to PDF for work orders. 2023-09-18 14:14:16 -04:00
Marc Durepos
70d8893178 bemade_fsm: added is_complete to tasks for easier PDF generation. 2023-09-18 14:14:16 -04:00
Marc Durepos
b787f81325 bemade_fsm: Add the beginning of the PDF report for service tasks. 2023-09-18 14:14:16 -04:00
Marc Durepos
29862ccc63 bemade_fsm: remove view override while Odoo get my JS fix onto servers. 2023-09-18 14:14:16 -04:00
Marc Durepos
0462256add bemade_fsm: many upgrades including better calendar view 2023-09-18 14:14:16 -04:00
Marc Durepos
9924f89508 bemade_fsm: updated data to make new stages appear in the FSM project 2023-09-18 14:14:16 -04:00
Marc Durepos
fde8cea071 bemade_fsm: fix in res_partner.py for pad field in domain. 2023-09-18 14:14:16 -04:00
Marc Durepos
dea9d8f54e bemade_fsm: data added for stages and equipment tags. 2023-09-18 14:14:16 -04:00
Marc Durepos
0a7736e55a bemade_fsm: make project.task.allow_billable store=True to un-break Odoo tests. 2023-09-18 14:14:16 -04:00
Marc Durepos
d9595f028c bemade_fsm: Update to ir.model.access.csv to fix duplicate insert. 2023-09-18 14:14:16 -04:00
Marc Durepos
7cadd52fc6 bemade_fsm: tie in with sale_planning to plan SO lines based on task templates. 2023-09-18 14:14:16 -04:00
Marc Durepos
a2d9f37ef2 bemade_fsm: Added logic to use the planned hours from task templates on sale order lines (for planning purposes). Re #11. 2023-09-18 14:14:16 -04:00
Marc Durepos
37aea5c181 bemade_fsm: Visits on sales orders now group created tasks under a common parent. Fixes #72. 2023-09-18 14:14:16 -04:00
Marc Durepos
454656159c bemade_fsm: Equipment to sale order line connection made. Fixes #71. 2023-09-18 14:14:16 -04:00
Marc Durepos
f997215aca bemade_fsm: added many2many relationship to equipment from sale order lines. Set up summary and default equipment_ids from sale order. Ref #71. 2023-09-18 14:14:16 -04:00